Linder Paint

Linder Exterior Emulsion Paint



Product Description

Linder Emulsion Paint for External Walls adopts a special formulation process to make the product with superb film-forming property, stability and adhesion, which improves the aging resistance, weathering resistance, scrubbing resistance, anti-staining property and stability of the emulsion paint, and completely overcomes the problems of alkalinity and cracks that are commonly found in the concrete external walls, and the paint surface is complete and long-lasting.


Product Features

1.Super strong film-forming property
2.Strong weatherability
3.Resistance to washing and brushing
4.Super strong self-cleaning and anti-fouling performance
5.Water resistance, strong air permeability
6.Super strong covering power


Construction process

Construction method: brushing, roller coating, spraying


Theoretical paint consumption

Total consumption is about (8-10) square meters/kg/one coat (dry film 30 microns).
Depending on the roughness of the actual surface and the dilution ratio, the amount of paint consumed may vary.


Dilution

In order to facilitate the construction, it can be diluted with ≤20% (v/v) of water according to the actual situation (it can be increased or decreased according to the feel of the construction);

Mix well before use.


Recoating time (in terms of dry film 30 microns, 25~30℃)

Surface drying: 10 minutes -Hard drying: 30 minutes -Recoating: ≥2 hours


Substrate Requirements

The base should be solid, level, clean and dry.


Maintenance time

7 days/25℃: low temperature (should not be lower than 5℃) appropriate extension, in order to obtain the ideal paint film effect.


Construction conditions

Please do not construct in wet or cold weather (temperature <5℃, relative temperature >85%), otherwise the expected painting effect cannot be achieved.


Cleaning

When stopping in the middle of painting and after finishing, please wash all the instruments with water in time.


Substrate treatment


 surface treatment

  Remove surface dust, grease and loose plaster from new walls, repair any holes in time and ensure that the walls are clean, dry and level.

  Repainting the wall to remove the old wall not solid paint film, remove surface dust chalk and impurities, batch leveling and sanding, clean and thoroughly dry.

  surface state   Ensure that the surface humidity of the pre-coated substrate is <10% and the pH value is <10.  The surface of the pre-coated substrate must be firm, dry, clean, flat and free of loose material.


Coating System and Number of Coats


Painting System

primers

top coat

  Construction method   “Linder Multi-Functional Anti-Alkali Sealing Primer” once more   Two coats of “Linder topcoat”


Safety matters

1.Please be sure to read the construction instructions of the product package carefully before use, in order to obtain reliable and satisfactory painting effect;
2.Open all windows and doors as much as possible before starting operation and use to ensure that the construction area has sufficient ventilation;
3.In case of allergic skin, always wear protective gears during use; in case of inadvertent contact with eyes, rinse immediately with plenty of water; in case of inadvertent contact with skin and causing persistent pain or irritating sensation, rinse immediately with plenty of water and seek medical assistance;
4.Do not allow children or pets to enter the construction area and keep the product out of their reach; if accidentally contaminated with children, immediately flush with plenty of water and seek medical assistance;
5.Do not pour paint into sewers or drains;

6.dispose of paint waste in accordance with local environmental standards.


Storage

Store tightly closed in a cool and dry place at 0-40℃.

Shelf life: 24 months


products